SEMMMMS Logo

04. Supporting Documents

All reports are PDF files:

Title            Report No.
Planning Application Statement  1007/13.09/149   
Design and Access Statement – Vol. 1  1007/6.15.2/180   
Design and Access Statement – Vol. 2  1007/6.15.2/181  (See below) 
Statement of Community Involvement  1007/6.15.2/182   

The Design and Access Statement – Vol. 2 consists of the structures reports, as follows: 
Title           Report No.  
Retaining Structures Preliminary Design Report  1007/7.04/145   
B001 A6 Bus Bridge – Preliminary Design Report  1007/704/081   
B002 – Hazel Grove to Buxton Feasibility Study Report  1007/7.04/082   
B003 Mill Lane Accommodation Bridge - Preliminary Design Report  1007/704/151   
B004 Mill Lane Bridle Bridge - Preliminary Design Report  1007/704/152   
B004A Norbury Bridge Widening – Preliminary Design Report  1007/704/153   
B005 Mill Hill Hollow Bridge – Preliminary Design Report  1007/704/085   
B005A Mill Hill Hollow Footbridge – Preliminary Design Report  1007/704/154   
B006 Hill Green Accommodation Bridge – Preliminary Design Report  1007/407/086   
B007 Woodford Road Bridge – Preliminary Design Report  1007/704/087   
B008 West Coast Mainline Over Bridge - Preliminary Design Report  1007/7.04/088   
B010B Woodford Road Bridge (Bramhall) – Preliminary Design Report  1007/704/133   
B012 Yew Tree Footbridge – Preliminary Design Report  1007/704/092     
B013 Styal Mainline Overbridge – Preliminary Design Report  1007/7.04/093   
B014 Styal Road Airport Spur – Feasibility Study Report  1007/7.04/094   
TR1-11 Dairy House Lane Culvert – Preliminary Design Report  1007/704/155   
TR1-12 Spath Brook Twin Culvert Extension – Preliminary Design Report  1007/704/156    

Further Documents:   
Title     Report No.
Transport Assessment  1007/6.15.2/183
  Transport Assessment Main Text*
  Transport Assessment Appendices 
  Transport Assessment Supporting Documents:-
    Local Model Validation Report
    Local Model Validation Report Update
    HFAS 1746 A6MARR Forecasting Report V1
    HFAS 1746A A6MARR Forecasting Report Appendices V1
    Traffic Modelling and Appraisal Report (as referenced in para 7.4 of the Transport Assessment)
    B.4 Variable Demand Model Development Report
    Table 9.3a - Forecast Annual Average Daily Traffic (DF7 + Enhanced Mitigation)
Socio-economic Impacts Report  1007/6.15.2/184   
Flood Risk Assessment  1007/6.7/061    
Street Lighting Design Statement  1007/10.7/105 
Tree Survey 1007/6.15.2/185
  Tree Survey Part 1 (Report Page 1 to Page 48)
  Tree Survey Part 2 (Tree Survey Drawings)
  Tree Survey Part 3 (Tree Survey Drawings)
  Tree Survey Part 4 (Tree Survey Drawings)
  Tree Survey Part 5 (Tree Survey Drawings)
  Tree Survey Part 6 (Tree Survey Drawings)
  Tree Survey Part 7 (Tree Survey Drawings)
  Tree Survey Part 8 (Tree Survey Drawings)
  Tree Survey Part 9 (Tree Survey Drawings)
  Tree Survey Part 10 (Tree Survey Drawings)
  Tree Survey Part 11 (Tree Survey Drawings)
Health Impact Assessment  1007/6.15.2/186   
Drainage Strategy Report  1007/6.7/062   
Airport Safeguarding  1007/11.01/165   
Sustainability Statement  1007/13.5/164   
Equalities Impact Assessment  1007/6.15.2/187   
Soft Landscape Specification  1007/5.7/097   
Landscape Management Plan  1007/5.7/098   
Code of Construction Practice  1007/10.4/134  
 

*There is a minor error on Page 174, Figure 9.7 of the Transport Assessment. The key in the bottom right hand corner of the figure should read as follows (with alterations in italics):
Key
2017 with Relief Road and Mitigation
2017 with Relief Road and Enhanced Mitigation
         2017 Flow increased by more than 5% with enhanced mitigation
•         2017 Flow change between ±5%
         2017 Flow decrease by more than 5% with enhanced mitigation
This error does not change any of the conclusions reached within the Transport Assessment.

To find out how we use cookies on our website please read our cookies privacy notice.